RECHAM Consultancy

Preparation of updated hydrological study for Upper Dordi A Hydropower project

Client
Liberty Energy Company Ltd.
Date
July 2018
Services
Preparation of updated hydrological study for Hydropower project

Preparation of updated hydrological study for the project based on the observed data of the project and compared with long term hydrological data collected from DHM.